Vipo: Firestop Drain Gullies
Vipo: Firestop Drain Gullies
Survey Equipment

Vipo: Firestop Drain Gullies

Availability:

To maintain the fire integrity between process deck modules, gaps and openings must be sealed to ensure the safety of onboard personnel during a fire event. Rubber drain gully systems designed by Vipo are installed between deck modules bridging any gap that exists between the structures.
The flexible sealing systems allow for misalignments, angular deviations and eliminate concentrations of stress while reducing vibration and dynamic loads between structures. The systems provide passive fire protection from all types of fires in the extreme offshore operating environments to ensure the safety of people, structures and equipment.

Features

Flexible and durable material

Maintenance free

More than 30 years design lifetime

Specifications

Availability

Blast, chemical UV, ozone and saltwater resistant

Rated to hydrocarbon and jet fire conditions

Applications

FPSO

Platforms

Rigs

FLNG’s

Product Enquiry


Case Studies